The revision history box is annotated to show that the document is an As-Built record. The As-Built document number consists of the original drawing number and the next available revision number. The Project Engineering Manager is responsible to ensure that the details and dimensions for ‘built-in’ and covered up work shall be recorded whilst work is open for inspection. The As Built document are historical documents prepared for future reference and shall therefore reflect the project conditions and specifications as they exist at the time of project completion. The document controller is responsible for the proper management storage and distribution of these as buil documents.Īll As-Built documentation shall be compiled and presented by amending the construction drawings, specifications or material schedules in sufficient detail to reflect the actual condition of the finished product. Project Engineering Manager is also responsible to collate all the As Built information received and shall coordinate the preparation of the project as built document.

The project Engineering Manager is responsible to prepare a list of the required ss build documentation and shall advise the Consultants, Subcontractors, Vendors, Manufacturers and Project staff of their responsibilities under this procedure. The sections below describe the process to follow:

The following personnel have responsibilities mentioned in this procedure: Procedure for Design Change and Clarification.

This procedure can be implemented in coordination with other procedures like: